On October 20, Secretary of Transportation Nick Donohue presented to the Senate Finance and Appropriations Committee on the recently announced highway maintenance shortfall of more than a billion dollars. The presentation covered how the Commonwealth got here, what it will take to fix it, and how the Commonwealth Transportation Board (CTB) can reduce the impact on new projects.
The Secretary proposed moving more money from construction into maintenance now, since this is more cost effective, while using a handful of other funding tools to cushion the blow to construction funding. Secretary Donohue stated plainly that any mitigation strategy the executive branch undertakes will be painful and will reduce the availability of construction funds, which will affect local projects as well.
How We Got Here
The core issue is materials and construction inflation. Construction and maintenance costs have roughly doubled over the past 10 years, as measured by the National Highway Construction Cost Index (NHCCI). Over that same decade, each dollar of VDOT revenue has grown about 40 percent from inflation, while each dollar of construction and maintenance cost has grown about 100 percent.
Starting in 2022, highway maintenance spending ran over budget as costs rose, and the CTB covered the gap with a series of one-time infusions taken from the annual construction budget. Then, in June 2025, the CTB adopted the previous administration’s recommended six-year budget, which cut pavement funding by more than $200 million per year starting in the second year and holding through year six. No analysis was presented on what that would do to road conditions, and most of the freed-up money was allocated to construction projects through FY30.
Why Maintenance Comes First
Virginia is a maintenance-first state, and both the Code and the budget say so. There is also a strong financial argument for making maintenance a statewide priority. Pavement kept in the preventive maintenance range costs about $80,000 per lane mile. As conditions worsen, costs multiply: $320,000 per lane mile (4x) for corrective work, $640,000 per lane mile (8x) for restoration, and $1.28 million (16x) for full roadway reconstruction.
If the current six-year budget stands, pavement conditions across Virginia will deteriorate and fall into disrepair over time, creating an economic and safety liability.
The Secretary’s Maintenance Recommendations
Pavement
Secretary Donohue recommends keeping the existing pavement targets, since that is cheaper over time than lowering them. He also recommends keeping the 2027 paving budget where it is, then increasing it by $239 million annually starting in 2028. The total need for VDOT-maintained roads would then average $839 million per year from 2028 to 2048 (in 2026 dollars).
Bridges
VDOT’s initial ask months ago was an extra $109 million per year to keep meeting current targets. The Secretary now recommends maintaining current bridge budgets, which total $530 million per year, on the assumption that the federal bridge program created by the IIJA continues. This would keep Interstate bridges at their current performance target (99%), but primary and secondary bridges across the Commonwealth would see some degradation in condition. If federal reauthorization does not extend the bridge program, the topic will need to be revisited.
Local maintenance payments
Localities have felt the same cost pressure, and the VDOT figures above cover only VDOT-maintained assets. The Secretary recommended a pro-rata increase to locality maintenance payments beginning in FY2028, tied to the increase in VDOT’s pavement maintenance funding. The estimated increase is about $70 million, bringing the total increase across VDOT and locally maintained roads to $310 million annually beginning in FY28.
The Cost to New Construction
Moving money into maintenance must come from somewhere, and that somewhere is new construction funding, a shift referred to as “crossover.” With no mitigation, the 8-year pool of unallocated money for new projects would fall by 49 percent across the four major construction programs, including SMART SCALE. In several of those programs, the first few years would not even cover projects that have already been allocated, forcing the CTB to shuffle funds or delay projects.
Mitigation Plan
To lessen the impact of increased crossover, the Secretary outlined a three-part plan using flexible funding sources already available. These actions would not fully address the impact on new construction, but they would substantially reduce it.
- First, use $230 million from the Priority Transportation Fund to bolster the Virginia Highway Safety Improvement Program (about $130 million) and the District Grant Program (about $100 million) for the next two rounds of SMART SCALE.
- Second, use $300 million in GARVEE bonds, which are debt backed by Virginia’s federal-aid highway formula funds, to bolster SMART SCALE (HPP and DGP) for the next two rounds.
- Third, redirect $705 million from the November 2025 action for priority projects and provide alternative pathways for funding those projects.
On that third piece, the CTB allocated $715 million in GARVEE and Priority Transportation Fund dollars to a list of projects in November 2025, and only about $10 million has been spent. The Secretary recommends moving about $555 million of those projects to readily available funding pools and programs. Six projects could not be matched with an available program, so the recommendation is for the CTB to vote to submit them to Round 7 of SMART SCALE, where they can compete for funding.
Together, the Secretary states, these steps cut the projected reduction in the 8-year unallocated pool for new projects from 49 percent to 25 percent:
| Program | No Mitigation | With Recommendations |
| High-Priority Projects (HPP) | 57% cut | 25% cut |
| District Grant Program (DGP), state portion | 58% cut | 26% cut |
| Interstate Operations and Enhancement (IOEP) | 44% cut | 32% cut |
| Virginia Highway Safety Improvement (VHSIP) | 37% cut | 13% cut |
| All four programs | 49% cut | 25% cut |
Policy Changes to Prevent a Repeat
Secretary Donohue also recommended that the Board adopt policy at its December meeting to keep this from happening again:
- Re-baseline pavement and bridge conditions every four years and report the findings to the CTB.
- Ensure each re-baseline forecasts the impact of current Commonwealth Transportation Fund budget levels on pavement and bridge conditions at least 20 years out.
- Require that any change in pavement or bridge maintenance spending of more than 5 percent year over year come with a description of the anticipated impact on conditions. In other words, the kind of analysis that was missing in June 2025 would become standard.
What Happens Next
The CTB will be asked to vote on the actions discussed at its December meeting. Localities should note that even if all the proposed mitigation efforts are adopted, there will still be about a 25 percent reduction in SMART SCALE funds over the next two rounds. That directly affects the availability of hundreds of millions of dollars for local and regional transportation projects. VACo will report on the CTB’s actions when they are made available in December.
VACo Contact: James Hutzler